products

Refresh For PC Outsourcing

Preparation of workstations

Prise en compte des besoins

Taking into account of all project needs

Intégration aisée

Easy integration with company IS

Haute qualité

High quality perceived by the user

Réduction des coûts

Reducing costs and time periods of projects

Manages all of the needs for projects for massive preparation of workstations, taking into account all of the project components.

Easily integrated into all of the Information Systems of companies and interfaces with the existing IS management tools

Has an advanced interface for communication with the end user, which is fully parameterizable, which contributes to the success of the deployment

Considerably reduces the costs and overall duration of the migration project by eliminating all manual intervention on workstations

  • Taking into account of all project needs
    Guaranteeing the quality and safety of the processes
    Optimizing the logistics to implement to intervene on each workstation.
    Refresh For PC Facilities Management takes into account the technical specificities, the organization of the preparation center, the schedule constraints for delivery and logistics, and the volume to be produced).

  • High quality perceived by the user
    Managing relations with all of the people involved, at the right time and with the right information.
    • Guaranteed workstation preparation quality: the user receives an operational workstation, with all of his applications
    • Bidirectional communication to all project actors is automatically integrated in the process.
  • Reducing the preparation duration and allowing for substantial parallel operations, thereby increasing the productivity of the installation operators.
  • Reducing costs and time periods
  • Decreasing and controlling the project time period.
    • Reduced project duration due to the implementation of a central platform and complete task automation.

    Decreasing the necessary human costs

    • A solution that requires only a small team to supervise the facilities, no intervention during the operation and which offers the possibility of workstation preparation 24 hours a day.
    • A preparation capacity of up to several hundred PC's simultaneously, with no mobilization of human resources

    Easy integration with the constraints of the IS of the client of the facilities manager

    • Adaptation of the tools to the project and not the reverse.
    • The taking into account of the constraints of the Information System, and the particular features of the workstations.
    • The taking into account of the constraints of the team in charge of the deployment.
    • The taking into account of architecture constraints (types of workstations, network, storage, etc.).

     

    The main functions

    • Communication adapted to the process: communication at the right moment in the process

     

    • Capacity for integration with the management tools of the Information System of the client company of the facilities manager (inventories, directories, distribution tools, etc.).

     

    • Management of prerequisites.

     

    • Parameterization of workstations if necessary, in accordance with the constraints of the end client.

     

    • Distribution of masters without overloading the network and automatic installation of the operating system.

     

    • Supervision of the distribution tools of the client to sequence the installation of the applications.

     

    • Updating of the inventory of the client company at the end of the preparation.

     

    • The supplying of detailed reports.